Construction is complete but the asset does not run
Systems are installed but untested and never brought to design parameters.
Project Management Services A9
Between "construction is finished" and "the asset is running" sit months that are usually unplanned. We plan and run this phase with the same discipline as construction.
How it is bought
We reply within 1 business day. A commercial proposal follows within 5 business days of the scoping meeting.
In substance
Commissioning starts during design, not after construction: the commissioning plan, system readiness criteria and documentation requirements all shape design decisions. An asset without a commissioning plan will be handed over late regardless of construction productivity.
Systems are installed but untested and never brought to design parameters.
Test sequence, resources, vendor attendance and required conditions are unplanned.
Faults are recorded ad hoc with no single punch list and no statuses.
Records, test reports and statutory documents do not meet acceptance requirements.
Staff are untrained and there are no procedures or service contracts.
Commissioning plan, system boundaries, test sequence and start-up readiness criteria.
Verification of mechanical completion, documentation completeness and pre-start conditions.
Vendor and contractor coordination during testing, verification of records and achievement of design parameters.
A single defect register categorised by start-up impact, with closure tracked.
Documentation pack prepared and the acceptance procedure supported.
Handover dossier assembled, as-builts and O&M documentation transferred, operator training delivered.
Deliverables
The specific documents, reports and management products that remain with the client.
The handover phase is planned and resourced in advance.
Testing verifies function, not merely installation.
The punch list is managed by start-up impact priority.
Documentation, procedures and trained staff transfer with the asset.
FAQ
Not answered here? Write to us and we will respond on your case.
Start-up works are the technical activities that bring equipment and systems to design parameters. Commissioning is the management process above them: planning, system boundaries, readiness criteria, participant coordination, documentation and verification of the result.
During design. System boundaries, test requirements and documentation scope influence design decisions and vendor contract terms. Planning handover after construction ends is reaction, not management.
Site records, as-built drawings, test and commissioning reports, equipment certificates and data sheets, operating instructions, warranty documents, service contacts and a closed punch list.
Contractor and work-front coordination, schedule, cost, quality and HSE.
Project document control: single environment, revisions, workflows, as-builts.
Quality assurance and control, occupational, industrial and environmental safety.
We manage the project on the owner's behalf — from the land plot to commissioning.
Tell us about the asset and the current stage — we will propose a working format and team composition. A commercial proposal follows within five business days of the meeting.
We reply within 1 business day. A commercial proposal follows within 5 business days of the scoping meeting.